It is great to see Heretaunga House featured in the latest edition of Business Central, showcasing the role prefabricated timber and strong collaboration have played in bringing this significant Hastings development to life.
The three-storey mass timber structure was completed in just 59 working days – demonstrating the speed and efficiency that can be achieved when considered design, precision manufacturing and coordinated construction come together.
TimberSpan precision-manufactured the laminated veneer lumber (LVL) components for the project, working closely with LT McGuinness and the wider project team. Each component was manufactured before arriving on site, ready to be efficiently assembled as part of the building’s structural system.
The process is described in the article as being a little like assembling a “giant Meccano set”. While the scale is considerably larger, the comparison captures the level of planning and precision required to ensure every component fits into place as intended.
Alongside faster construction, prefabricated timber systems can provide greater accuracy, reduce the amount of work required on site and support more efficient commercial construction.
Heretaunga House is a strong example of what can be achieved through collaboration across design, manufacturing and construction. TimberSpan is pleased to have contributed to the project alongside Tumu Property, LT McGuinness, Athfield Architects and the wider consultant and supply team.
Read the full Heretaunga House feature in Business Central.
